The Chestnut and Garland intersection will undergo a temporary 4-way stop allowing contractors to replace the traffic cabinet.
The change will occur on May 15 from 9 a.m. to 2 p.m. There will be several brief periods where stop signs will be present, changing the intersection.
Motorists are encouraged to follow posted traffic control signs and to drive with extreme caution in this area during the construction.